Established 2006 · Piarco

We build the infrastructure
Trinidad runs on.

Road paving, earthworks, drainage, and heavy equipment. Civil engineering delivered at every scale across Trinidad & Tobago.

Road works & paving

Two hundred roads,
rebuilt.

From the Sir Solomon Hochoy Highway to rural access roads, we deliver rehabilitation and resurfacing for the Ministry of Works and NIPDEC.

Earthworks & site preparation

Ground prepared for
what comes next.

Land clearing, back-filling, aggregate supply, and drainage systems that get major developments out of the ground.

Trusted by government agencies & private industry
Ministry of Works & Transport Housing Development Corporation NIPDEC NIDCO UDeCOTT Water & Sewerage Authority T&T Electricity Commission Port Authority of T&T Carib Brewery Angostura Halliburton University of the West Indies Ministry of Works & Transport Housing Development Corporation NIPDEC NIDCO UDeCOTT Water & Sewerage Authority T&T Electricity Commission Port Authority of T&T Carib Brewery Angostura Halliburton University of the West Indies
01 Who we are

A leading construction and excavating contracting firm rooted in Piarco, trusted by government ministries, state agencies, and private industry across Trinidad, Tobago, and Guyana.

Read our story →
18+
Years
in operation
500+
Projects
completed
40+
Government &
private clients
03
Countries
we've built in
02 Capabilities

What we do,
at every scale.

Seven disciplines under one contractor, from site clearing and earthworks through to the final paved surface.

Land Development

Land Development

Civil engineering and land clearing

Site Preparation

Site Preparation

Back-filling, clearing, and aggregate supply

Road Works

Road Works

Bridge construction, road marking, and safety systems

Concrete Pumping

Concrete Pumping

Efficient, reliable, exceptional

Asphalt Paving

Asphalt Paving

Paving, resurfacing, and asphalt hot mix

Equipment Rental

Equipment Rental

Quality equipment at great rates

03 How we build

A road is six layers.
We lay every one.

From compacted subgrade to the final wearing course, each layer is placed, compacted, and tested to specification before the next goes down.

01
02
03
04
05
Existing ground
  1. Compacted subgrade CBR tested

    Existing ground graded and rolled to density before anything is laid on it.

  2. Sub-base 200 mm

    Crushed aggregate placed and compacted in lifts to spread load evenly.

  3. Base course 150 mm

    Dense graded stone. The structural core that carries the traffic loading.

  4. Binder course 60 mm

    Coarse asphalt that bonds the base to the running surface above.

  5. Wearing course 40 mm

    Asphalt hot mix from our own plant, laid and rolled to final level.

  6. Road marking Thermoplastic

    Lines, studs, and traffic safety systems. The road opens to traffic.

05 Who we build for

Every scale.
Every sector.

The same crews, plant, and standards applied across housing estates, industrial compounds, and commercial property.

06 What clients say

Trusted on site,
project after project.

Great!

Marvin Francis Posted on Google

Placeholder review. Replace with a real client quote about how the works were delivered, the standard of finish, and whether the programme was met.

Client name Posted on Google

Placeholder review. Replace with a real client quote covering site management, safety record, or coordination with other contractors on the project.

Client name Posted on Google